JM Engineering Maya Building

When the owner of the Maya Building in downtown Missoula decided to expand their usable space by adding a 4th story to the existing structure, they called on JM Engineering to devise a new mechanical and plumbing system for the building.   The project presented a unique challenge due to the fact that there is very limited space inside the wooden ceiling joists of the original building to house all duct work for both the new and existing areas.

The magnitude of the job becomes apparent when you compare the intricacy of the floor plans to the deceivingly simple elevation drawings shown here.

Illustration of the 3rd Floor Mechanical Plan -Maya Building

3rd Floor Mechanical Plan -Maya Building

4th Floor Mechanical Plan - Maya Building

4th Floor Mechanical Plan – Maya Building

 

 

 

 

 

 

 

Mechanical Section 3rd + 4th Floor

Mechanical Section 3rd + 4th Floor

Here are a few more photos of the construction site as the renovations are underway.